Clean, root-free native ground.
Building a custom home, detached shop, garage, or ADU requires more than cutting brush at ground level. Clear Grade clears raw and overgrown lots across Snohomish and Eastside King County, removing trees, digging out full root balls inside structural footprints, and opening construction access.
Inspectors and structural engineers require all organic duff, topsoil, stumps, and root balls stripped out from beneath footings, slabs, and driveways. Leaving buried wood under fill dirt leads to rot voids and cracked concrete years later.

Zero wood under your slab
Grinding stumps or burying slash under a future slab, footing, or driveway causes ground settlement as wood rots. Within building and driveway zones, we excavate stumps and structural roots completely and strip organic duff down to firm native soil.
- Construction-footprint clearing from builder stakes or site plans
- Complete tree removal, bucking, and full root-ball extraction
- Construction entrance and temporary gravel access setup
- Brush mulching on perimeter buffer zones or full haul-off by truck and trailer
Right Rock & Material Guide
See how crushed basalt fines, structural base rock, recycled asphalt millings, clean drain stone, and bulk soils perform in wet Western Washington conditions.
Request Written Options for Lot Clearing for Building.
Upload or text 2 to 4 photos of your work area and access width for a free written estimate, or schedule an on-site operator walkthrough.
Protect mature keeper trees
Most Puget Sound lots keep mature perimeter cedars or firs for privacy and county tree-retention rules. We flag retained trees and critical-area buffers before work starts so buckets and tracks stay clear of protected root zones.
Agreed site finish
Building and road footprints are cleared of trees, stumps, and organic soil down to firm native ground, with rough construction access ready for rock placement.
Smooth handoff into pad prep and trenching
Handling lot clearing, rough grading, gravel access, and utility trenching with one contractor eliminates scheduling gaps and finger-pointing between separate tree and dirt crews.
- Share your site plan, staked house/shop corners, and proposed driveway entrance location.
- Mark keeper trees, protected drainfield reserve zones, and wellheads.
- Confirm where stripped topsoil should be stockpiled on site or if full truck haul-off is needed.
A closer look at the work
Representative Pacific Northwest equipment, aggregate, and finish examples showing typical site conditions and Clear Grade work standards.
Frequently asked questions
Why dig stumps out instead of grinding them on a building lot?
Grinding leaves 70% of the underground stump bowl and wood chips mixed in the soil. As that wood decays, soil settles several inches and cracks slabs or driveways. Full excavator extraction removes the wood completely.
Can you install the gravel construction entrance at the same time?
Yes. Most jurisdictions require a quarry-spall construction entrance and silt fence to keep mud off public streets. We install quarry spalls over geotextile fabric right as clearing begins.
Do you clear lots for detached garages, pole barns, and DADUs?
Yes. Backyard shop and ADU footprints are core work for Clear Grade - from tight urban infill lots in Kirkland and Lynnwood to 5-acre parcels in Snohomish and Monroe.