Smooth slopes & positive drainage.
After tree removal, construction, or years of soil settling, a bumpy, water-trapping yard is impossible to mow or enjoy. Clear Grade reshapes and levels residential yards and acreage across Snohomish and Eastside King County, setting clean slopes that shed rainwater away from your home and prep the surface for sod, seed, or landscaping.
Rough, rutted ground left behind after tree work or old landscaping traps rainwater and makes mowing miserable. Proper yard grading balances cut and fill across the yard while establishing gentle, positive surface drainage away from your home.

Rough grading vs finish lawn-ready grading
Cutting down high mounds and filling stump craters creates a clean rough grade. For new lawns, we follow up by raking out cobbles/roots and spreading a uniform layer of screened sandy-loam topsoil ready for seed or sod.
- Post-clearing and post-construction yard restoration and smoothing
- Negative-grade correction to pitch surface water away from foundations
- Cut-and-fill leveling to turn sloped backyards into usable flat play or patio zones
- Screened topsoil import, machine spreading, and finish raking
Right Rock & Material Guide
See how crushed basalt fines, structural base rock, recycled asphalt millings, clean drain stone, and bulk soils perform in wet Western Washington conditions.
Request Written Options for Yard Grading & Land Leveling.
Upload or text 2 to 4 photos of your work area and access width for a free written estimate, or schedule an on-site operator walkthrough.
Level does not mean trapping water
In Western Washington, dead-flat clay holds puddles all winter. Even a "flat" lawn or yard area is graded with a subtle 1% to 2% pitch toward a swale, drain, or natural runoff edge so grass stays firm.
Agreed site finish
Smooth, walkable contours pitched cleanly away from buildings and ready for topsoil, seed, sod, or landscape beds.
What helps us quote your yard fast
Send 3 to 4 wide photos showing the uneven area and access width, approximate length x width, and tell us whether you want existing dirt shaped or fresh topsoil brought in.
- Show high mounds, stump holes, or puddles you want eliminated.
- Check gate/side-yard clearance width from the driveway.
- Decide between rough earth shaping only vs finish grading with fresh screened topsoil.
A closer look at the work
Representative Pacific Northwest equipment, aggregate, and finish examples showing typical site conditions and Clear Grade work standards.
Frequently asked questions
When is the best season to grade clay soil in Snohomish and King counties?
Dry weather from late spring through early fall produces the cleanest finish on fine lawn soil, because saturated winter clay smears if overworked. Gravel pads, rock spreading, and drainage grading can be completed year-round.
How much slope should a yard have away from a house foundation?
Building standards call for roughly 6 inches of fall within the first 10 feet from your foundation wall where space allows, transitioning into a gentle 1% to 2% lawn slope toward a swale or drain.
Do you supply and spread new lawn topsoil too?
Yes. Native Puget Sound subsoil is often rocky glacial till; capping rough-graded dirt with 3 to 4 inches of imported sandy-loam topsoil gives sod and grass seed a fast, lush start.


